Partnering with Northbuild Constructions, we were engaged to assist with the deployment of an advanced lubrication reticulation system, as well as supply, position and install a compressed air delivery system in conjunction with a relocated air compressor. A great result was achieved for a project set to tight criteria.

Project Challenge

Our client, NorthBuild Constructions was engaged to build a new Heavy Truck Maintenance Facility for Hastings Deering and needed a partner who could assist them with the deployment of an advanced lubrication reticulation system capable of delivering to a very tight set of criteria. The project scope also included the supply and installation of a system to deliver compressed air and the positioning and connection of an existing air compressor which was relocated from another site. The Main Workshop is approximately 18 metres high at its peak and the lubrication lines had to be installed across the underside of the roof to allow for gantry cranes to be used in the workshop.

Hastings Deering – Toowoomba QLD - Partnering with Northbuild Constructions, we were engaged to assist with the deployment of an advanced lubrication reticulation system, as well as supply, position and install a compressed air delivery system in conjunction with a relocated air compressor. A great result was achieved for a project set to tight criteria.
Hastings Deering – Toowoomba QLD - Partnering with Northbuild Constructions, we were engaged to assist with the deployment of an advanced lubrication reticulation system, as well as supply, position and install a compressed air delivery system in conjunction with a relocated air compressor. A great result was achieved for a project set to tight criteria.
Hastings Deering – Toowoomba QLD - Partnering with Northbuild Constructions, we were engaged to assist with the deployment of an advanced lubrication reticulation system, as well as supply, position and install a compressed air delivery system in conjunction with a relocated air compressor. A great result was achieved for a project set to tight criteria.

The project included:

Client Benefit

Completed on time and on budget, our client now has a highly effective lubrication system which delivers on their required flow rates over their extended pipe runs. As a result, staff are able to maximise the throughput of their new workshop, keep equipment in an operational state, all in a timely manner.