Looking for a safe and reliable maintenance facility for their light to medium plant, The Australian Defence force and John Holland construction engaged Levanta based on our experience and history of the right solution for the job. Brake testers, lubrication, exhaust extraction and compressed air systems were designed, supplied and installed in this defence project.

Project Challenge

The Client, John Holland Constructions and the Australian Defence Force, were building a new maintenance facility for their light to medium plant. They required a high availability lube reticulation system, exhaust extraction system and compressed air. In addition they also identified the need for a safe and reliable solution for lifting a wide range of vehicles and other equipment, as well as a roller brake tester and tyre changer for medium vehicles.

Our Solution

The project went to tender and Levanta was successful in their bid as a sub-contractor to a Sydney Based company that was doing the HVAC and other engineering systems for the hydrocarbon (oil) reticulation and compressed air work packages. We were also successful in a direct bid for the Lifting, Brake Testing and Tyre Changer package.

Government facility project Military Barracks – Liverpool NSW

The project included:

Client Benefit

Working as a sub-contractor, we delivered to brief, to budget, on time and as promised. The result was a successful design, supply, manufacture and install of specific components within the full fit out, which allowed Australia’s Defence Force to successfully service and maintain critical vehicles and equipment.